The Ruston returned to service today. A small consignment of slates needed to be taken down the Tramway and so the Ruston was used for this trip. All went well, although the chain tensioner would benefit from some adjustment! The video shows the engine working at both speeds – shunting and main line.
Mike Barton
Looks terrific. The speed change switching seems to work well too.